When the grid is stressed (a fault, a voltage dip, a frequency swing), the question for every solar, wind and storage plant is whether it stays online and keeps supporting the system or drops out at exactly the wrong moment. Disturbance reports have shown IBRs tripping and curtailing during events again and again. PRC-029-1, developed in response to FERC Order No. 901, is NERC's answer. It became effective in the U.S. on October 1, 2026, with phased implementation.

What it requires

It applies to Generator Owners of BES IBRs and of non-BES IBRs of 20 MVA or more connected at 60 kV or above.

  • R1, voltage ride-through: stay connected through the voltage excursions defined in Attachment 1. Momentary cessation isn't allowed in the must-ride-through zone, so units that stopped injecting current during low voltage may need new settings or hardware.
  • R2, performance during voltage excursions: how the IBR must behave while riding through, including current injection.
  • R3, frequency ride-through: stay connected through the frequency excursions in Attachment 2, and through rate-of-change-of-frequency up to 5 Hz/s.
  • R4, documented hardware limitations: legacy IBRs that physically can't comply, where only replacing hardware would fix it, may document that within 12 months of the effective date and send it to the PC, TP, TOP, RC and Compliance Enforcement Authority. It's an auditable evidence package, not a free pass.

Why it's different

PRC-029-1 is largely performance-based. Compliance shows up in how plants actually behave during real events, measured by the disturbance data PRC-028-1 requires. That means settings, control modes, OEM documentation, legacy-hardware evaluations, notifications and post-event records, often across dozens of facilities.

What our check does

  • Determines applicability across your fleet, BES and non-BES
  • Checks ride-through and momentary-cessation settings for each inverter model against the attachments
  • Reviews recorded events (via PRC-028 data) for ride-through performance
  • Assembles and tracks R4 hardware-limitation documentation and its deadline
  • Keeps dated evidence for each requirement, ready for audit

Your engineers still make the technical calls. The platform does the comparison, the tracking and the paperwork.