Standards
The NERC standards data phleet keeps audit-ready.
Each page below is a plain-language reference to the standard (what it requires, who it applies to, the evidence an auditor will ask for, where teams get caught), followed by exactly what data phleet does for it. Every summary is checked against the effective standard on nerc.com and linked to it.
Inverter-based resources
IBR Disturbance Monitoring
PRC-028-1 requires Generator Owners of inverter-based resources to record what their plants do during disturbances.
Requirements, evidence, automation →PRC-029-1IBR Ride-through
PRC-029-1 requires inverter-based resources to stay connected and keep supporting the grid through defined voltage and frequency excursions.
Requirements, evidence, automation →PRC-030-1Unexpected IBR Event Mitigation
PRC-030-1 requires Generator Owners of inverter-based resources to catch, analyze and fix unexpected drops in plant output.
Requirements, evidence, automation →Protection and control
Protection System Maintenance
PRC-005-6 requires Transmission Owners, Generator Owners and Distribution Providers to maintain their Protection Systems, Automatic Reclosing and Sudden Pressure Relaying, and prove it.
Requirements, evidence, automation →PRC-019-2Voltage Regulating Controls Coordination
PRC-019-2 requires that a generator's voltage regulating controls, limiters, equipment capability and protection settings are coordinated, so limiters act before protection and protection still prevents damage.
Requirements, evidence, automation →PRC-024-4Frequency and Voltage Protection Settings
PRC-024 requires generator frequency and voltage protection to be set so it doesn't trip a unit inside the "no trip zone" during a grid excursion.
Requirements, evidence, automation →PRC-025-2Generator Relay Loadability
PRC-025-2 requires load-responsive protective relays at generators to be set so they don't trip a unit during a system disturbance for conditions that don't risk equipment damage.
Requirements, evidence, automation →Facilities and assets
Facility Ratings
FAC-008-5 requires Generator Owners and Transmission Owners to rate their Facilities with a documented methodology and to prove every rating follows it.
Requirements, evidence, automation →InventoryAsset Inventory
AI-read inventory of generation, transmission, distribution and cyber assets, for audits, mobilizations and changes of ownership.
Requirements, evidence, automation →Critical infrastructure protection
BES Cyber System Categorization
CIP-002-5.1a requires Responsible Entities to identify their BES Cyber Systems and categorize them as high, medium or low impact, which decides which other CIP requirements apply.
Requirements, evidence, automation →CIP-003-9Security Management Controls
CIP-003-9 sets the management controls for cyber security.
Requirements, evidence, automation →CIP-004-7Personnel and Training
CIP-004-7 covers the people who can reach high and medium impact BES Cyber Systems.
Requirements, evidence, automation →Next on the roadmap
MOD-025-2 (generator real and reactive capability), MOD-026-2 (dynamic model verification, effective April 1, 2026, phased in) and VAR-002-4.1 (voltage schedules). Get notified when they ship →