Insights
Notes on NERC compliance, and what we've shipped.
Product releases, standard-by-standard explainers and our view on AI in compliance. For reference material, start with the standards, the IBR guide or the compliance calendar.
2026
- Product
data phleet adds FAC-008 Facility Ratings to its automated NERC compliance portfolio
data phleet now automates FAC-008-5 Facility Ratings: methodology, most limiting series element and rating consistency.
- Insight
Rethinking NERC compliance: a “bring your own consultant” model
Don't choose between your compliance consultant and automation. With data phleet, consultants work inside your license on the same data.
- Insight
AI and NERC compliance: the “looks right” problem
Generative AI gives confident, well-formatted answers. In NERC compliance a wrong threshold can hide under a clean table nobody questions.
- Insight
AI and NERC compliance: the risk of non-deterministic compliance logic
General-purpose AI can produce different logic for the same prompt. NERC compliance checks must be repeatable, documented and defensible.
- Product
Automating PRC-029-1 ride-through compliance for inverter-based resources
PRC-029-1 requires IBRs to ride through voltage and frequency disturbances from October 1, 2026. What it requires and how data phleet checks it.
- Insight
AI and NERC compliance: putting sensitive grid data into public AI tools
Pasting protection settings or topology into public AI tools raises CIP-011 and CIP-013 questions. What to consider and how utilities respond.
- Product
data phleet expands into CIP with automated CIP-002 categorization
data phleet's CIP-002 module automates BES Cyber System identification and high, medium and low impact categorization.
- Product
Automated PRC-030-1 checks: finding and analyzing unexpected IBR output changes
PRC-030-1 requires IBR owners to find, analyze and mitigate unexpected output reductions. data phleet screens every disturbance record.
- Product
Automated PRC-028-1 checks: proving your disturbance recording is complete
PRC-028-1 requires SER, fault and dynamic disturbance recording at IBRs. data phleet verifies coverage, settings and time sync before an event.
- Company
What makes data phleet different: it reads the records
Most NERC compliance tools schedule, remind and store. data phleet reads your records and surfaces the evidence and its gaps. Three questions for any vendor.
- Product
PRC-025-2: the hidden risk in generator relay loadability
PRC-025-2 keeps load-responsive relays from tripping generators within capability. Where the risk builds up, and data phleet's automated check.
- Product
Automated PRC-024 checks: frequency and voltage protection settings
data phleet checks generator frequency and voltage protection settings against the PRC-024 no-trip zones and flags any element that could trip.
- Product
Automated PRC-019-2 checks: coordinating voltage regulating controls with protection
PRC-019-2 requires generator limiters, controls and protection to be coordinated every five years. data phleet automates the study and evidence.
2024
- Product
data phleet announces the first automated PRC-005 check
dp: PRC-005-6 reads maintenance records, one-lines and settings to check protection system maintenance compliance automatically, with human review.
- Product
dp: Inventory: automated asset inventories for the electric power industry
dp: Inventory reads one-lines, settings sheets and manufacturer documents to build structured inventories of generation, T&D and IT/OT assets.
- Product
Automated inventories for plant mobilizations
In recent plant mobilizations, dp: Inventory produced required inventory reports in minutes instead of dozens of hours, and it compares each run with the last.
2023
2022
- Insight
Labor shortage, automation and the energy industry
The energy industry faces retirements and compliance brain drain. Automating repetitive work helps retain experienced staff and attract new engineers.
- Product
data phleet completes the first automated NERC PRC compliance check (PRC-024-3)
In 2022 data phleet completed and tested the first automated NERC PRC compliance check, for PRC-024-3 generator frequency and voltage protection settings.
See it on your own records.
Thirty minutes with one site's records: we surface the evidence live and show you the gaps. No slides.