Highland, Utah · November 3, 2026
data phleet, a technology company that automates North American Electric Reliability Corporation (NERC) compliance, today added FAC-008 (Facility Ratings) to its portfolio of automated NERC requirements.
FAC-008 ensures that Facility Ratings used to plan and operate the Bulk Electric System are determined with technically sound principles. Those ratings set the limits of equipment and feed System Operating Limits. For Generator Owners and Transmission Owners, demonstrating compliance means keeping a documented methodology, validating equipment ratings against manufacturer data and engineering standards, identifying the most limiting series element, and keeping all of it current as equipment is replaced, upgraded or re-rated. The information spans engineering, operations, asset management and compliance teams.
FAC-008 is also among the most frequently reported standards: NERC's 2025 CMEP mid-year report listed it among the three most frequently reported Operations and Planning standards.
“FAC-008 is an excellent example of where technology can make a meaningful difference in NERC compliance. The challenge isn't simply understanding the requirement. It's maintaining accurate engineering information, ensuring that equipment ratings and supporting documentation remain aligned, and being able to demonstrate compliance when requested. We're focused on reducing that manual burden through automation while keeping engineering professionals involved in review and decision-making.” Ryan Larsen, CEO and co-founder, data phleet
“Every additional requirement we automate gives our customers another opportunity to reduce manual compliance work and redirect valuable engineering resources toward higher-value activities. Our objective is to make NERC compliance more manageable, consistent, and sustainable across all of our customer locations and the entire industry.” Ryan Larsen
About data phleet
data phleet provides a SaaS platform that performs NERC compliance checks and collects evidence for organizations in the U.S. electric industry, across PRC, CIP and FAC standards, with MOD and VAR in development. Deployment options include Microsoft Azure-hosted SaaS, hybrid and on-premise.
Media contact
Ryan Larsen, data phleet, Inc. · rlarsen@dataphleet.com · +1 801-787-1747
Also distributed via EIN Presswire.