PRC-005-6 Automated today
Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
PRC-005-6 requires Transmission Owners, Generator Owners and Distribution Providers to maintain their Protection Systems, Automatic Reclosing and Sudden Pressure Relaying, and prove it. You need a Protection System Maintenance Program (R1). If you use performance-based intervals, follow Attachment A (R2, R4). If you use time-based intervals, meet the minimum activities and maximum intervals in the standard's tables (R3). And you must show efforts to correct Unresolved Maintenance Issues (R5).
| Status | In effect |
|---|---|
| Applies to | Transmission Owners, Generator Owners, Distribution Providers |
| Scope | Protection Systems, Automatic Reclosing and Sudden Pressure Relaying that affect the BES |
| Intervals | Time-based per Tables 1-1 through 1-5, 2, 3, 4-1 through 4-3 and 5, or performance-based per Attachment A |
| Related | PRC-024, asset inventory |
What PRC-005-6 requires
Our plain-language summary of each requirement. The standard's text governs.
Protection System Maintenance Program
Establish a PSMP that identifies the maintenance method for each component type and the activities and intervals that apply.
Performance-based intervals
If you use performance-based intervals, establish and maintain them using the Attachment A procedure.
Time-based maintenance
Maintain components in time-based programs to the minimum activities and maximum intervals in the standard's tables.
Follow your performance-based program
Implement and follow the PSMP for components in performance-based programs.
Unresolved Maintenance Issues
Demonstrate efforts to correct identified Unresolved Maintenance Issues.
Evidence an auditor will ask for
- The PSMP itself, with the method for each component type
- Maintenance records proving every component met its interval, including relays, CTs/PTs, DC supply and batteries, communications, and auxiliary relays
- For performance-based programs, the Attachment A population and countable-event analysis
- Records of Unresolved Maintenance Issues and the corrective work
Where teams get caught
- Components that exist in the field but not in the PSMP inventory
- Battery and DC supply records, which can take the longest to assemble at large sites
- Intervals calculated from the wrong date after a partial test
- Evidence spread across CMMS exports, spreadsheets and paper
What data phleet does for PRC-005-6
- Reads one- and three-line diagrams, maintenance records, settings sheets and nameplates directly
- Builds the component inventory and matches every component to its PSMP interval and latest maintenance record
- Flags overdue, missing and undocumented maintenance, with the source record
- Ships each run as XLSX, PDF, a gaps report and a pre-filled RSAW

PRC-005-6 questions
Who does PRC-005-6 apply to?
Transmission Owners, Generator Owners and Distribution Providers, for Protection Systems, Automatic Reclosing and Sudden Pressure Relaying that affect the reliability of the BES.
What's the difference between time-based and performance-based maintenance under PRC-005?
Time-based programs follow the fixed maximum intervals in the standard's tables. Performance-based programs set intervals from the actual failure performance of a component population, using the procedure in Attachment A.
Other standards we cover
- PRC-019-2 Voltage Regulating Controls Coordination
- PRC-024-4 Frequency and Voltage Protection Settings
- PRC-025-2 Generator Relay Loadability
- PRC-028-1 IBR Disturbance Monitoring
- PRC-029-1 IBR Ride-through
- PRC-030-1 Unexpected IBR Event Mitigation
- FAC-008-5 Facility Ratings
- CIP-002-5.1a BES Cyber System Categorization
- CIP-003-9 Security Management Controls
- CIP-004-7 Personnel and Training
- Inventory Asset Inventory
See your PRC-005-6 evidence, organized.
Book 30 minutes. Bring one site's records and we'll surface the evidence live, show you the gaps and walk through the reports.