PRC-029-1 IBRAutomated today
Frequency and Voltage Ride-through Requirements for Inverter-Based Resources
PRC-029-1 requires inverter-based resources to stay connected and keep supporting the grid through defined voltage and frequency excursions. Generator Owners must ensure both design and operation meet the must-ride-through zones in Attachments 1 and 2 (R1, R3), meet voltage-performance rules during excursions (R2), and ride through RoCoF up to 5 Hz/s. Legacy IBRs with genuine hardware limits can document an exemption under R4, but the documentation is due within 12 months of the effective date.
| Status | Effective October 1, 2026 (phased in) |
|---|---|
| Applies to | Generator Owners of BES IBRs, and non-BES IBRs ≥ 20 MVA aggregate connected at ≥ 60 kV |
| U.S. effective date | October 1, 2026, phased in |
| R4 exemption deadline | Documentation and copies to PC, TP, TOP, RC and CEA no later than 12 months after the effective date (by October 2027). Exemption deadline explained → |
| Frequency | Ride through the Attachment 2 zone with |RoCoF| ≤ 5 Hz/s |
| Replaces | PRC-024 for IBRs; PRC-024-4 now covers synchronous, Type 1 and Type 2 wind and synchronous condensers |
| Related | PRC-028-1, PRC-030-1, PRC-024 |
What PRC-029-1 requires
Our plain-language summary of each requirement. The standard's text governs.
Voltage ride-through
Each IBR's design and operation must meet or exceed ride-through in the Attachment 1 must-ride-through zone, with narrow exceptions such as disconnecting to clear a fault. No tripping from phase-lock-loop loss of synchronism.
Voltage performance during excursions
While voltage at the high side of the main power transformer is within the continuous region and during defined excursions, each IBR must meet the standard's current-injection and recovery behavior, unless a documented R4 hardware limitation exists.
Frequency ride-through
Each IBR must ride through frequency excursions inside the Attachment 2 must-ride-through zone when the absolute rate of change of frequency is 5 Hz/s or less.
Documented hardware limitations
For IBRs in service by the effective date with hardware that can't meet R1–R3: document the IBR, which criteria it can't meet, the specific hardware, technical proof that only physical replacement would fix it (not software or settings), and any remediation plan. Send it to the PC, TP, TOP, RC and CEA within 12 months of the effective date.
Evidence an auditor will ask for
- Inverter and plant-controller settings showing ride-through and momentary-cessation configuration
- Manufacturer documentation and studies supporting design capability
- Disturbance recordings (from PRC-028-1) showing actual performance during events
- For R4: the hardware-limitation package and dated transmittals to every required entity
Where teams get caught
- Momentary cessation left enabled in the must-ride-through zone on older inverters
- Claiming an R4 exemption for a limitation that a firmware update or setting change would fix. R4 requires proof that only hardware replacement works.
- Design compliance documented but no linkage to operational evidence from real events
- Missing the one-time 12-month R4 window
What data phleet does for PRC-029-1
- Inventories your IBR fleet against PRC-029-1 applicability, BES and non-BES
- Organizes voltage and frequency ride-through settings device by device, and flags settings for engineering review against the reference tables
- Tracks the design documentation per unit: ride-through settings, momentary cessation, current injection
- Links each unit to its PRC-028-1 recordings and PRC-030-1 events automatically
- Assembles and tracks the R4 hardware-limitation package and its transmittals

PRC-029-1 questions
When is the PRC-029-1 R4 exemption documentation due?
No later than 12 months after the standard's effective date. With a U.S. effective date of October 1, 2026, that's October 2027. It only applies to IBRs in service by the effective date.
Does PRC-029-1 replace PRC-024 for solar, wind and storage?
For inverter-based resources, yes. PRC-024-4, effective October 1, 2026, narrows PRC-024 to synchronous generators, Type 1 and Type 2 wind resources and synchronous condensers. IBR ride-through moves to PRC-029-1.
Can a firmware update qualify as a hardware limitation?
No. R4 requires technical documentation that the limitation is due to hardware that would have to be physically replaced, and that software updates or setting changes can't remedy it.
Other standards we cover
- PRC-005-6 Protection System Maintenance
- PRC-019-2 Voltage Regulating Controls Coordination
- PRC-024-4 Frequency and Voltage Protection Settings
- PRC-025-2 Generator Relay Loadability
- PRC-028-1 IBR Disturbance Monitoring
- PRC-030-1 Unexpected IBR Event Mitigation
- FAC-008-5 Facility Ratings
- CIP-002-5.1a BES Cyber System Categorization
- CIP-003-9 Security Management Controls
- CIP-004-7 Personnel and Training
- Inventory Asset Inventory
See your PRC-029-1 evidence, organized.
Book 30 minutes. Bring one site's records and we'll surface the evidence live, show you the gaps and walk through the reports.