Frequency and Voltage Protection Settings
PRC-024 requires generator frequency and voltage protection to be set so it doesn't trip a unit inside the "no trip zone" during a grid excursion. Frequency protection is checked against Attachment 1 (R1), voltage protection against Attachment 2 at the high side of the GSU (R2), any equipment limitation must be documented (R3), and settings go to the Planning Coordinator or Transmission Planner within 60 days of a request or change (R4). On October 1, 2026 PRC-024-4 took effect for synchronous generators, Type 1 and 2 wind and synchronous condensers; inverter-based resources moved to PRC-029-1.
| Status | PRC-024-4 effective October 1, 2026 (replaces PRC-024-3) |
|---|---|
| Current version | PRC-024-4 (U.S. effective October 1, 2026) |
| Applies to | PRC-024-4: Generator Owners and Transmission Owners, for synchronous generators, Type 1 and Type 2 wind resources and synchronous condensers |
| Voltage reference | High side of the GSU or main power transformer; the no-trip zone ends at 4 seconds |
| Data requests (R4) | Settings to the PC or TP within 60 calendar days of a written request or a change |
| IBRs | Now governed by PRC-029-1 |
| Related | PRC-019-2, PRC-025-2 |
What PRC-024 requires
Our plain-language summary of each requirement. The standard's text governs.
Frequency protection
Set applicable frequency protection per Attachment 1 so it doesn't trip the facility within the no-trip zone during a frequency excursion, with listed exceptions.
Voltage protection
Set applicable voltage protection per Attachment 2 so it doesn't trip within the no-trip zone during a voltage excursion measured at the high side of the GSU or MPT. Below 0.90 pu, for example, the unit must ride through for 3.00 s, and below 0.75 pu for 2.00 s.
Document limitations
Document each known regulatory or equipment limitation that prevents meeting R1 or R2, with supporting study results, event experience or manufacturer advice.
Provide settings
Give the Planning Coordinator or Transmission Planner your applicable settings within 60 calendar days of a written request, and within 60 days of any change.
Evidence an auditor will ask for
- Dated setting sheets and voltage-time or frequency-time boundary overlays (M1, M2)
- The voltage conversion from the relay's measuring point to the GSU high side, with tap positions
- Documented limitations with supporting studies or OEM statements (M3)
- Dated transmittals of settings to the PC or TP (M4)
Where teams get caught
- Comparing relay pickups to Attachment 2 without converting from the generator terminal to the GSU high side
- Forgetting volts-per-hertz elements, which are in scope
- A settings change at an outage that never triggers the 60-day R4 notification
- Still documenting IBRs under PRC-024 after the move to PRC-029-1
What data phleet does for PRC-024
- Uses PRC-024-4, the version in effect, and keeps PRC-024-3 rules for runs and audits before October 1, 2026
- Reads 27, 59, 81 and 24 elements straight out of relay settings files, with no transcription
- Plots every element against the Attachment 1 and 2 boundaries at the GSU high side, ready for your engineers to review
- Flags any element that appears to trip inside the no-trip zone, with the source page
- Re-runs automatically when a settings file changes, and tracks the R4 60-day clock

PRC-024 questions
Does data phleet support PRC-024-4?
Yes. data phleet uses PRC-024-4, the version in effect since October 1, 2026. Earlier results stay tied to the PRC-024-3 logic they were run with, so past evidence remains reproducible.
What changed between PRC-024-3 and PRC-024-4?
PRC-024-4, effective October 1, 2026, applies to synchronous generators, Type 1 and Type 2 wind resources and synchronous condensers, and adds Transmission Owners to the functional entities. Inverter-based resource ride-through moved to PRC-029-1. The voltage no-trip boundary data points are unchanged.
Where is voltage measured for the PRC-024 no-trip zone?
At the high side of the generator step-up (GSU) or main power transformer. Relays usually measure at the generator terminals, so settings have to be converted (accounting for actual transformer taps) before they're compared to Attachment 2.
Is there software that automates PRC-024-4 settings verification?
Yes. data phleet reads the 27, 59, 81 and 24 elements straight from relay settings files, converts voltage to the GSU high side, plots every element against the PRC-024-4 Attachment 1 and 2 no-trip boundaries, and flags anything that appears to trip inside the no-trip zone, with the source page, for your engineers to review. It re-runs when a settings file changes and tracks the R4 60-day clock.
How long must a unit ride through 0.90 pu?
Under PRC-024 Attachment 2 (the same data points in PRC-024-3 and PRC-024-4), voltage below 0.90 pu must not cause a trip for 3.00 seconds, and below 0.75 pu for 2.00 seconds. The no-trip zone ends at 4 seconds.
Other standards we cover
- PRC-005-6 Protection System Maintenance
- PRC-019-2 Voltage Regulating Controls Coordination
- PRC-025-2 Generator Relay Loadability
- PRC-028-1 IBR Disturbance Monitoring
- PRC-029-1 IBR Ride-through
- PRC-030-1 Unexpected IBR Event Mitigation
- FAC-008-5 Facility Ratings
- CIP-002-5.1a BES Cyber System Categorization
- CIP-003-9 Security Management Controls
- CIP-004-7 Personnel and Training
- Inventory Asset Inventory
See your PRC-024 evidence, organized.
Book 30 minutes. Bring one site's records and we'll surface the evidence live, show you the gaps and walk through the reports.