PRC-024 requires Generator Owners to set frequency and voltage protection so units don't trip inside the no-trip zones of Attachments 1 and 2 (unless a documented exception applies), and to give those settings to the Planning Coordinator or Transmission Planner within 60 days of a request or change.

Update: PRC-024-4 became effective October 1, 2026, and the check now runs against it, with the same Attachment 2 voltage boundary. PRC-024-4 covers synchronous generators, Type 1 and 2 wind and synchronous condensers, and adds Transmission Owners; IBR ride-through moved to PRC-029-1.

The manual way

Collect every 27, 59, 81 and volts-per-hertz setting; convert pickups to per-unit at the right measurement point; plot each element against the curves; document; repeat for every change. Technical, detailed and slow.

What our check does

  • Reads protection settings directly from relay files and setting sheets
  • Converts pickups and delays to the measurement point the attachment uses
  • Tests each element against the no-trip zone and flags the ones that could trip inside it
  • Produces audit-ready output and tracks changes over time

No spreadsheets, no hand-drawn curves, no version chaos. It's the same check we first automated in 2022, now part of a broader protection and control library.