The case for automation
How many hours does your team spend assembling NERC evidence?
Our estimates of the manual effort per standard per site: finding documents, pulling values out of them, cross-checking against the requirement, populating the RSAW and packaging the evidence. Field testing is not included. Adjust to your fleet to see the staff time, and the cost, of doing NERC compliance by hand versus with automation.
0manual hours per cycle (typical)
0staff-days
0evidence packages data phleet assembles in minutes
Typical figures assume experienced compliance staff at a generating facility with 1–4 units and a standard protection scheme. IBR sites generally run 20–40% longer because manufacturer documentation varies so much. Ranges shown per site.
Tracking vs. surfacing
| Capability | Spreadsheets and trackers | data phleet |
|---|---|---|
| NERC-specific rules | Generic; built and maintained by you | Written per requirement with NERC SMEs |
| Time per evidence package | 2–6 hours, per unit | Seconds to minutes |
| Reading documents | Manual transcription | Read directly, with source references |
| Missing data | Often assumed | Flagged for a person |
| Repeatability | Depends who did it | Same records, same result, versioned rules |
| Audit output | Assembled by hand | XLSX, PDF, gaps report, pre-filled RSAW |
| Human accountability | Yes | Yes: every review and decision recorded |
See it on your own records.
Thirty minutes with one site's records: we surface the evidence live and show you the gaps. No slides.