PRC-025-2 Automated today
Generator Relay Loadability
PRC-025-2 requires load-responsive protective relays at generators to be set so they don't trip a unit during a system disturbance for conditions that don't risk equipment damage. It has one requirement: apply settings in accordance with Attachment 1, which gives the criteria for each relay type and configuration, while keeping reliable fault protection.
| Status | In effect |
|---|---|
| Applies to | Generator Owners, Transmission Owners and Distribution Providers that apply load-responsive protective relays at the terminals of the listed generation elements |
| Requirement | R1: settings in accordance with PRC-025-2 Attachment 1 for each load-responsive relay |
| Typical relays | Phase distance (21), phase overcurrent (51, 51V), and similar load-responsive elements |
| Related | PRC-019-2, FAC-008-5, PRC-026 |
What PRC-025-2 requires
Our plain-language summary of each requirement. The standard's text governs.
Apply Attachment 1 settings
For each load-responsive protective relay, apply settings that meet the Attachment 1 criteria for its application (generator, GSU, unit auxiliary transformer, lines and elements serving the unit) while maintaining reliable fault protection.
Evidence an auditor will ask for
- Setting sheets for each load-responsive relay
- The Attachment 1 calculation for each, with the capability data it used
- Proof the calculation still matches current capability and ratings after changes
Where teams get caught
- Capability curves and facility ratings change, but the loadability calculation isn't redone
- Settings that pass on paper with almost no margin
- Protection, ratings and capability data owned by three different teams
- Reconstructing the analysis for an audit instead of showing it was continuously true
What data phleet does for PRC-025-2
- Ingests generator capability and rating data directly
- Keeps each load-responsive relay's settings next to the capability data its Attachment 1 criteria depend on
- Flags missing data and settings for your engineers to review
- Compares settings files run to run, so changes are caught before they become exposure

PRC-025-2 questions
What is the purpose of PRC-025-2?
To set load-responsive protective relays at generation facilities at a level that prevents unnecessary tripping of generators during a system disturbance, for conditions that don't pose a risk of damage to the equipment.
Is PRC-025-2 the same as the power-swing standard?
No. PRC-025-2 is about loadability, meaning relays must not trip on heavy but survivable loading. Stable power swings are addressed by PRC-026.
Other standards we cover
- PRC-005-6 Protection System Maintenance
- PRC-019-2 Voltage Regulating Controls Coordination
- PRC-024-4 Frequency and Voltage Protection Settings
- PRC-028-1 IBR Disturbance Monitoring
- PRC-029-1 IBR Ride-through
- PRC-030-1 Unexpected IBR Event Mitigation
- FAC-008-5 Facility Ratings
- CIP-002-5.1a BES Cyber System Categorization
- CIP-003-9 Security Management Controls
- CIP-004-7 Personnel and Training
- Inventory Asset Inventory
See your PRC-025-2 evidence, organized.