Generator Relay Loadability

PRC-025-2 requires load-responsive protective relays at generators to be set so they don't trip a unit during a system disturbance for conditions that don't risk equipment damage. It has one requirement: apply settings in accordance with Attachment 1, which gives the criteria for each relay type and configuration, while keeping reliable fault protection.

Key facts
StatusIn effect
Applies toGenerator Owners, Transmission Owners and Distribution Providers that apply load-responsive protective relays at the terminals of the listed generation elements
RequirementR1: settings in accordance with PRC-025-2 Attachment 1 for each load-responsive relay
Typical relaysPhase distance (21), phase overcurrent (51, 51V), and similar load-responsive elements
RelatedPRC-019-2, FAC-008-5, PRC-026

What PRC-025-2 requires

Our plain-language summary of each requirement. The standard's text governs.

R1

Apply Attachment 1 settings

For each load-responsive protective relay, apply settings that meet the Attachment 1 criteria for its application (generator, GSU, unit auxiliary transformer, lines and elements serving the unit) while maintaining reliable fault protection.

Evidence an auditor will ask for

  • Setting sheets for each load-responsive relay
  • The Attachment 1 calculation for each, with the capability data it used
  • Proof the calculation still matches current capability and ratings after changes

Where teams get caught

  • Capability curves and facility ratings change, but the loadability calculation isn't redone
  • Settings that pass on paper with almost no margin
  • Protection, ratings and capability data owned by three different teams
  • Reconstructing the analysis for an audit instead of showing it was continuously true

What data phleet does for PRC-025-2

  • Ingests generator capability and rating data directly
  • Keeps each load-responsive relay's settings next to the capability data its Attachment 1 criteria depend on
  • Flags missing data and settings for your engineers to review
  • Compares settings files run to run, so changes are caught before they become exposure
data phleet PRC-025-2 settings file comparison
Relay settings file comparison in a customer environment. Two processed settings files side by side, catching loadability drift between revisions.

PRC-025-2: the hidden risk in generator loadability →

PRC-025-2 questions

What is the purpose of PRC-025-2?

To set load-responsive protective relays at generation facilities at a level that prevents unnecessary tripping of generators during a system disturbance, for conditions that don't pose a risk of damage to the equipment.

Is PRC-025-2 the same as the power-swing standard?

No. PRC-025-2 is about loadability, meaning relays must not trip on heavy but survivable loading. Stable power swings are addressed by PRC-026.

See your PRC-025-2 evidence, organized.