PRC-025-2 often gets treated as a one-time documentation exercise. It isn't. The standard requires Generator Owners, Transmission Owners and Distribution Providers to set load-responsive protective relays per Attachment 1, so they don't trip a generator while it's operating within its capability. That's where quiet risk accumulates.
Where it gets hard
- Capability drift. Capability data and ratings change; relay settings don't, unless someone triggers a review.
- Silos. Settings, ratings and capability data live in different systems owned by different teams.
- Thin margins. A pickup can pass with almost nothing to spare, and nobody sees the margin erode.
- Audit reconstruction. Analysis gets rebuilt after the auditor asks, rather than shown from a running record.
What our check does
- Ingests generator capability, GSU and rating data along with relay settings
- Calculates the Attachment 1 criteria for each load-responsive element
- Shows the margin, not just pass or fail, and flags thin ones
- Re-runs when a setting or rating changes, and keeps the history
- Produces the evidence package on demand
With PRC-005-6, PRC-019-2, PRC-024 and now PRC-025-2 automated, protection and control compliance becomes something you can check any day, not only before an audit.