The short answer
A battery energy storage system (BESS) is an inverter-based resource, so a non-BES battery or hybrid plant of 20 MVA or more connected at 60 kV or above is likely a Category 2 Generator Owner and Operator. The IBR standards apply: PRC-028-1 for disturbance monitoring, PRC-029-1 for ride-through and PRC-030-1 for unexpected output reductions. So do the standards every generator owner maintains, such as PRC-005 for Protection System maintenance, FAC-008 for facility ratings and CIP-002/CIP-003. PRC-024-4 does not apply; IBR ride-through moved to PRC-029-1.
What applies, and what's different for storage
| Standard | For a BESS |
|---|---|
| PRC-028-1 | Disturbance recording at the plant, time-synced to UTC. The recordings feed PRC-029 and PRC-030. |
| PRC-029-1 | Frequency and voltage ride-through for the inverters. Legacy hardware limitations need R4 documentation by October 1, 2027. |
| PRC-030-1 | Screen for drops of ≥20 MW and ≥10% of gross nameplate in 4 seconds. No irradiance or wind exclusion for a standalone battery, so dispatch records matter. See COMTRADE screening. |
| PRC-005-6 | Maintenance of the Protection Systems at the plant, including station DC supply. |
| FAC-008-5 | Facility ratings from the most limiting element in the path, including the MPT and collector system. |
| CIP-002 / CIP-003 | Categorization under CIP-002, then the CIP-003 controls that follow, including vendor remote access to the PCS and EMS. |
| PRC-024-4 | Not applicable to IBRs. |
Illustrative; confirm applicability against your registration and NERC's Category 2 compliance-date list.
Where data phleet fits
data phleet automates PRC-028-1, PRC-029-1, PRC-030-1, PRC-005, FAC-008, CIP-002 and CIP-003 on the same plant data, starting with an asset inventory built from your one-lines and nameplates. See the Category 2 IBR guide and building a NERC compliance program.
Related questions
Is a battery energy storage system an inverter-based resource under NERC?
Yes. Battery storage connects through inverters, so it is an inverter-based resource. A non-BES battery or hybrid plant of 20 MVA or more aggregate nameplate, connected at 60 kV or above, falls in the Category 2 GO/GOP registration criteria.
Does PRC-024-4 apply to battery storage?
No. PRC-024-4 covers synchronous generators, Type 1 and Type 2 wind resources and synchronous condensers. Ride-through for inverter-based resources, including storage, is in PRC-029-1.
How does the PRC-030-1 energy-source exclusion work for a battery?
The energy-source exclusion covers changes in primary energy source availability such as wind speed or irradiance. A standalone battery has neither, so an output drop has to be explained by one of the other exclusions (for example, a dispatch or planned operation, with the dispatch records to show it) or analyzed as an event.
What about solar-plus-storage hybrid plants?
Registration looks at the aggregate nameplate that has or contributes to the capacity delivered at the common point of connection. For PRC-030-1 screening, look at total plant output and keep both irradiance and dispatch records, because either can explain a drop.